Committed Costs

Are the costs of design and development, engineering, testing and production that are engineered into a product or service at the design stage of development that should occur if all design specifications are followed during production.  Can also be referred to as Non-Recurring Engineering costs.
Have more questions? Submit a request

0 Comments

Please sign in to leave a comment.
Powered by Zendesk